Roofing


Centering is the first activity in Roof construction. Metal plates of sizes 2 x 3 feet are positioned at 10 feet height to provide a flat base and support for the RCC roofing. These metal plates would remain in position until the roof is fully laid and cured. The plates are coated with a non-stick material to ensure the concrete dosent stick on it.




R.C.C. Framework and Electrical Nodes



Casting was done on 14th Jan 2008 after almost a month's preperation from the time the centering work began. Casting is a big effort and took almost 9 hours to complete.




Curing will continue till end of Jan.



The first floor brickwork is expected to commence in early Feb. That gives us some time to fine tune the first floor design.