Saturday, September 27, 2008

Thursday, September 18, 2008

Painting



With most of the plastering done it was time to start painting. A water based primer is the first coat that goes on the inner walls. It is specially formulated to give better alkaline resistance and filling property. The application of primer ensures better quality and durability of finish coat.



After the Primer dries up two coats of Putty are applied. Next the surface is rubbed with emery paper to remove minor cracks and defects. The surface is now ready to take on color. Totally three layers of color coats are applied with the third and final layer done after a gap of six months.




Saturday, June 7, 2008

Doors & Windows

The door & window frames arrived in early June.



The front door was installed on 8th August.

Plastering

Plastering work started in first week of June...




....and took almost 12 weeks to complete. There was 2-3 week delay due to the monsoons. By end of Aug we were preparing to finalize the floor tiles. Tiling would be the next major activity and expected to start in early September.

Saturday, May 3, 2008

First floor roofing

First floor casting was done on 18-April-2008.





Few pictures, starting from the south east corner and going around to north-west.






Sunday, April 6, 2008

Electrical Work





Plumbing Work

Kitchen & Utility


Ground Floor Bathroom

Friday, February 8, 2008

I Floor Brickwork

Study:
Bed Room:

Family Room:
Terrace: